
The prefabricated management office and dining hall buildings, totaling 250 m², for the Danone Factory in Tekirdağ were completed in 30 days on a turnkey basis. These structures, which were implemented with a functional and aesthetic design approach in line with user needs, aimed to increase operational efficiency in the factory.
The rapid completion of the project was made possible thanks to the effective coordination of our company in the production and assembly processes and the dedication of our experienced team. We continue to offer innovative solutions to the needs of industrial facilities with modern prefabricated construction technologies.
Pramo Prefabrik constructed earthquake-resistant and long-lasting structures using light steel construction and quality materials in this project. The project is an important example in terms of effective and efficient use of residential area. The Halkalı construction site mobilization project is a successful project reflecting Pramo’s customer-oriented approach and high competence in engineering.
We are a professional solution partner in prefabricated product alternatives with Prefabricated, Container, Heavy Steel and Light Steel construction systems that we manufacture in our 14.500 m2 production facility.
Our Services
Contact / Gebze Factory
Foreign Trade & Headquarters
© Pramo Prefabricated | Container | Steel
We build your dreams, we shape your future with prefabricated solutions!